The Moorhen Marsh Western Pond Turtle Enhancement Project: Phase A

< Back to the Project

Construction Updates

  • Construction Updates- Week of March 19, 2018 - The majority of Phase A construction is finished. Below are highlights of construction activities completed in February and early March: Completed terrestrial plantings (except for dip netting area) Installed irrigation system Installed the retaining wall in the dip net area in Pond E Hydro-seeded levee trails The remaining tasks to complete Phase A are listed […]
  • Construction Updates for the Week of November 27,2017 - Following is a summary of main work items performed recently: Completed reconstruction of the levees in ponds C, D and E, utilizing geo-grid. Placed the finish soil over the reconstructed levee slopes. Completed excavation and forming the deep water channels in ponds C, D and E. Completed construction of the island in pond C and […]
  • Construction Updates for the Week of November 6, 2017 - Progress continued for the habitat enhancement project throughout October and into November for Phase A. The following highlights the construction tasks completed last month: Completed reconstruction of 95% of all the levees in ponds C, D and E, utilizing geogrid. Placed the majority of finish soil over the reconstructed levees. Continued excavation and forming the […]
  • Construction Completed through the week ending September 29, 2017 - Following is a summary of main work items performed recently: Completed keyways in ponds D and E. Continued reconstruction of the levees in ponds E and D utilizing geogrid. Continued moisture conditioning pond soils. Continued dewatering local ponding water in pond E. Removed unsuitable concrete fill from existing levees in pond D and placed as […]
  • Construction Completed through the week ending September 15, 2017 - Following is a summary of main work items performed recently: Completed approx. 80% of levee keyways in ponds C, D and E. Partially excavated and formed the deep water channels in ponds C, D and E. Imported and placed select fill for pond C east levee, where the levee was seeping from raised slough water […]
  • Construction Update for the Week ending September 1, 2017 - Following is a summary of the main work items performed in Moorhen Marsh recently: The contractor continued drying (wind-rowing and disking) pond soils to correct moisture content. The contractor continued dewatering local ponding water in ponds C, D and E. Workers excavated some of the levee keyways in ponds C, D and E, installed fabric […]
  • Construction Update- Week of August 14, 2017 - Last week, (week of August 7) the contractor had to deal with high water levels in Peyton Slough causing water to leak into pond C. The main work items last week involved dewatering pond C and re-drying the soils there. The contractor also continued to dry/moisture condition soils in ponds D and E. This week […]
  • Construction Updates– Week of July 17, 2017 - Following is a summary of main work items during the week July 17, 2017: •Completed vegetation removal and drying in Ponds C, D and E (except small area by tree with nest, pond C). •Continued ripping and drying the soils in ponds C, D and E. •Continued dewatering local ponding water in Pond E. •Wallace-Kuhl […]
  • Construction Updates – Week of July 10, 2017 - Week of July 10, 2017 Continue vegetation removal and drying in Ponds C, D and E. Continue dewatering in Ponds D and E. Continue Soil drying Ponds C, D and E. Haul and dispose of vegetation – starting primarily 7/9/17 for approx. 1 week. Stockpile asphalt/debris from ponds. Install rock and grade on access road.
  • Construction Updates – Week of July 3, 2017 - Week of July 3, 2017 Continued vegetation removal and drying in Ponds C, D and E. Continued dewatering in Pond D. Began dewatering in Pond E. Soil drying Ponds C, D and E.

Construction Photo Gallery

Construction Videos

Soil Compacting


Backfilling the levee keyway in pond E

Breaking Ground

Entering Pond E for the first time

Removing Vegetation

Removing Vegetation in Pond D

Grading Soil in Pond D

Vegetation Removal in Pond E

Soil Ripping in Pond E